Commercial & office moving in Denver.

Workstation-by-workstation planning, careful IT handling and after-hours scheduling, so your team is back to work on the first day.

Scope

Per workstation

Timing

After hours

Equipment

IT and AV care

Scope an office move by workstation

An office move is a set of small moves that have to finish together. The cleanest way to scope it is by workstation, not by square foot. Count desks, chairs, filing units, monitors and personal items for each person, then add shared spaces: conference rooms, break rooms, server closets and storage.

That count turns into labor hours, crate quantities and truck loads. It also gives the office manager a way to assign each person a crate number and a destination desk, which is the single biggest factor in a fast Monday morning.

Office move inventory checklist
ItemWhat to countWhy it matters
WorkstationsDesks, chairs, pedestal drawersSets crew size and total hours
Shared furnitureConference tables, couches, lockersOften needs disassembly and a larger truck
IT and AVServers, switches, displays, phonesNeeds labeling and a power-down plan
RecordsFiling cabinets and boxesHeavy, and sometimes confidential
Special itemsSafes, lab gear, kitchen equipmentNeeds specific handling and sometimes a vendor

After-hours and weekend scheduling

Most offices cannot stop working for a day. The usual answer is to move on a Friday evening or over a weekend, with a Monday morning go-live. After-hours moves often mean more coordination with building management, security and elevators, and sometimes a premium on labor.

The fastest way to lose a weekend is to learn on Friday that the freight elevator is not available until Saturday at noon. Ask the building manager for freight elevator hours, loading dock rules and any required paperwork at least two weeks ahead.

IT equipment and the Monday test

The IT plan decides whether Monday works. Servers, switches and phone systems need a documented shutdown order, labeled cabling and a restart order that someone has written down and tested. Workstations are simpler: label each cable bundle with the person and the desk, and photograph the setup.

  • Back up before anything moves, and verify the backup restores.
  • Label every device and every cable end with matching tags.
  • Pack monitors upright in dedicated cartons or padded crates.
  • Move network core equipment last and set it up first.
  • Schedule a smoke test with a handful of users before the full go-live.

Phase the move to protect the business

For larger offices, a single move night may be too much. Phasing lets one team move while another keeps working. The trade-off is a longer project and two sets of logistics.

Your team is under 30 people

Move in a single weekend with labeled crates

Your team is 30 to 150 people

Move by department in two or three waves

You have a server room or lab

Move that space on its own plan with its own vendor

Your lease ends before the new space is ready

Ask about short-term storage and delayed delivery

You are consolidating two offices

Inventory and cull before anything is packed

A planning timeline

Office move planning timeline
WhenWhat happens
8 weeks outConfirm lease dates, request estimates, reserve freight elevators
6 weeks outWalkthrough, inventory, crate quantities, floor plan for the new space
4 weeks outStaff communication, crate delivery, IT plan finalized
2 weeks outBuilding paperwork, parking and loading plan, vendor schedule
Move weekStaff pack personal items, final inventory, backups verified
Move nightLoad, transport, place, IT restart
MondaySmoke test, punch list, crate pickup

The bottom line

What planning saves

Downtime

A labeled inventory and a tested IT restart cut the time to a working Monday.

Rework

Destination tags and floor plans avoid moving the same crate twice.

Risk

Building rules and insurance paperwork handled early prevent weekend surprises.

Send your headcount and the addresses through the quote form, or run a rough number in the estimator using the office option.

At a glance

Best for

Offices, clinics, studios and small to mid-size teams

Priced by

Workstations, labor hours, equipment and scheduling

Scheduling

Weekday, evening or weekend

Get a quote303-731-6588
Clean storage room with stacked boxes and blanket-wrapped furniture on pallets